Flow Assurance


production chemistry

Flow Assurance creates a reliable, manageable and profitable flow of fluids from the reservoir to sales. It is a diverse field that requires a fully integrated approach from various disciplines such as science, engineering and operations. As exploration and production expand into deeper water and smaller fields become more economic, flow assurance must take on a new perspective and focus.

Typically, basic crude analysis provides limited information that may be used to predict fluid behaviour under production conditions. Field development plans can be based upon data which fails to identify and quantify problem areas such as solids deposition, blockages and foaming etc.

AWT have an experienced Flow Assurance and Production Chemistry team who can design and execute studies to evaluate and clarify flow assurance issues. When coupled with our engineering teams, this offers clients unique access to integrated Flow Assurance solutions. Furthermore our expertise can add value to all phases of field life from concept, design, commissioning, operation and troubleshooting.

Typical considerations in a Flow Assurance study of your reservoir can include the issues depicted in the following diagram.

Flow Assurance study elements

Challenging Crudes

AWT have extensive design & operational experience with heavy/waxy crude production. High in-situ viscosities and unfavorable mobility ratios may require

  • Long-reach or Multi-laterals
  • Sand control
  • Innovative artificial life design

Design considerations must include issues, such as flow assurance

  • Well bore damage & emulsion blocks
  • Pipelining of high viscosity fluids
  • Wax & asphaltene deposition
  • High BS&W in export crude
  • High oil levels in disposal water

The following are recent projects when AWT were been involved in the conceptual design, FEED, detailed design and execution of challenging crude oil developments;

Client Project Name Description AWT Involvement
Exxon Mobil Wandoo Field Offshore oilfield thin reservoir & gas cap 19? API crude highly emulsifying large water production Completion design for 1000-1500m horizontal wells
Reservoir drill-in fluid system selection
Emulsion & water treatment programs
Supervision of successful well construction and testing
On-going production chemistry
Apache Stag Field Offshore oilfield thin reservoir & gas cap 19? API crude highly emulsifying ESP artificial lift uncontrolled sanding potential Downhole chemical treatment design
Emulsion & water treatment programs
On-going production chemistry support
On-going workover support
ROC Oil Cliff Head Field Offshore oilfield 34?C pour point crude highly emulsifying zero discharge environment Design & supervision of discovery well test
Conceptual field development
Flow assurance studies
Process design
Unique Artificial Lift Design
Alba Res. Mariner Field Offshore oilfield 17 deg API high viscocity 17cp highly emulsifying zero discharge environment Conceptual field development plan and well design
Flow assurance studies
Process design
Artificial lift design
OMV Maari Field Offshore oilfield 25?C pour point crude seawater injection Flow assurance assessment
Emulsion studies
Artificial Lifting design studies
Produced water re-injection design